Deliver Clash-free, Accurate, and Coordinated Construction Model through our BIM Coordination Services and BIM Process

We strongly believe in “Prevention is better than cure”, and that’s the guiding principle we follow in our BIM Coordination services during key stages of building design – schematic design, design documents, and construction documents.

During the entire BIM coordination process, we run multiple clash detection tests to reduce hard and soft clashes thus leading to a clash-free coordinated construction model.

We believe in “Collaborating Coordinating Better” so we work closely with the entire team of subcontractors (mechanical, electrical, plumbing, fire system), general contractors, architects, structural engineers, etc. Our consultative approach during the entire BIM coordination process helps team members make collective decisions for design changes or modifications.

Services + Benefits

With the help of Autodesk Revit and Navisworks, we help AEC professionals at every stage of design-to-construction workflow with our clash detection and BIM coordination services. With the successful experience of varied projects, we aim to facilitate this critical design process in BIM.

✔ Identify the design interference before the construction process.

✔ Clash detection report helps in better team collaboration between architects, structure engineers, MEP engineers, contractors, and building owners.

✔ It reduces the risk of human errors- thus reducing the amount of changes during the construction process.

✔ Achieving accurate design before the construction process can save a lot of money, time, and resources.

BIM Coordination

Deliver Clash-free, Accurate and Coordinated Construction Model through our BIM Coordination Services and BIM Process

clashreport

Clash Report Generation

Provide a clash report dashboard covering soft & hard clashes and showing progress made over time for a gatekeeper meeting – MEP engineers, architects, general contractors, designers, and building owners.
clashdetectionicon2

Soft & Hard Clash Detection

Identify and resolve soft & hard clashes within each discipline/trade that were unidentified during the individual design of each discipline– architectural, structural, mechanical, electrical, and plumbing.
coordinationicon

Coordination Ownership

Accompany you for the on-site gatekeeper meetings/visits or be a part of coordination meetings, facilitating the entire building design coordination phase from schematic design to construction documents.
designmodification

Design Modification

Iteratively implement the required design changes, discussed during the coordination meetings, into the MEP system model, and eventually deliver a coordinated construction model.

Process

1. LOAD MEP BIM TEMPLATE

Load MEP BIM template based on the client’s standards for each of the listed trades: mechanical, electrical, plumbing & sanitary, and fire protection.

2. VERIFY THE ARCHITECTURAL MODEL

Verify/Check the coordinate of the Architectural model with MEP models by using the “Origin to Origin” positioning approach before linking them.

3. PREPARE THE MEP MODEL

Prepare the MEP model for each of the disciplines – Mechanical, Electrical, and Plumbing, and include all elements for coordination within the central file.

4. RUN THE CLASH DETECTION

In Navisworks any two models are coordinated together and by clicking on “Run Test”, it shows the “Clash Report ” occurred between the coordinated model.

5. REVIEW & RESOLVE CLASHES

After resolving clashes, we reload the cache in the Navisworks make sure resolved clashes are in yellow, and check if any new clashes will show up in red.